Your success in VMware 3V0-624 is our sole target and we develop all our 3V0-624 braindumps in a way that facilitates the attainment of this target. Not only is our 3V0-624 study material the best you can find, it is also the most detailed and the most updated. 3V0-624 Practice Exams for VMware 3V0-624 are written to the highest standards of technical accuracy.
P.S. Refined 3V0-624 study guides are available on Google Drive, GET MORE: https://drive.google.com/open?id=1AdP-kxdhQXyY8voAK3_SvgcNZ8Cx9Zod
New VMware 3V0-624 Exam Dumps Collection (Question 3 - Question 12)
New Questions 3
A customer has storage arrays from two different storage vendors at two different sites. The customer warts to restore operations at the secondary site in the event of a disaster.
Which VMware technology must be used to meet this requirement?
A. vSphere replication
B. vSphere Data Protection
C. array-based replication
D. vSphere Fault Tolerance
Answer: A
New Questions 4
A customer is using a vSphere APIs for Storage Awareness (VASA) compatible storage array. The VASA provider is published as a virtual appliance.
To ensure recoverability, where must the VASA prowler and vCenter server virtual machines be stored?
A. The VASA provider and vCenter Server will be placed on the standard datastore (VMFS, NFS).
B. The VASA provider and vCenter Server will be placed on the vVol datastore.
C. The vCenter Server will be placed on the vVol datastore and the VASA provider will be placed on the standard datastore (VMFS, NFS).
D. The VASA provider will be placed on the vVol datastore and the vCenter Server will be placed on the standard datastore (VMFS, NFS)
Answer: A
New Questions 5
A company is designing a new vSphere cluster to support a mission-critical application.
u2022 The application requires 100% availability and cannot be restarted to recover from an ESXi host failure.
u2022 The application consists of a group of 16 virtual machines, each with 8 vCPU configured. Which solution satisfies the availability requirements?
A. Guest OS-based software clustering
B. vSphere High Availability
C. vSphere High Availability Application Monitoring
D. vSphere Fault Tolerance
E. vSphere Site Recovery Manager
Answer: A
New Questions 6
Categorize the tools as providing either Availability or Recoverability.
Answer:
New Questions 7
A company is consolidating its IT operations efforts by moving the Finance, IT, and QA departments towards a self-service environment, following SDDC best practices.
u2022 All departments have different priorities and expectations for uptime of the required infrastructure and applications.
u2022 Project stakeholders are still discussing final approvals for the budget wan the CFO.
u2022 To drive down the operating cost of the environment, only blade servers will implement this project.
u2022 To ensure business continuity, a colocation provider was chosen to fail over virtual machines.
u2022 The implementation of the project will follow a public reference architecture provided by VMware. What is the assumption in this scenario?
A. The chosen architecture is sufficient.
B. All departments demand different SLAs.
C. Final budget approvals are being discussed.
D. The environment will be shared by several departments.
Answer: A
New Questions 8
In the vCenter HA configuration below, drag the two correct components to the blank boxes in this diagram. The same component may be used more twice (Choose two.)
Answer:
New Questions 9
A company is outsourcing its support operations to an external service provider and plans to complete the project by April 1.
u2022 The external Support engineers must have the ability to power cycle, create, and edit virtual machines settings within their assigned vSphere site.
u2022 The company maintains three vCenter servers in Enhanced Linked Mode that are run as virtual machines in the supported infrastructure.
u2022 The vCenter servers will be supposed by the external service provider.
u2022 Each vCenter server is connected to its own local Platform Services Controller and MSSQL database server.
u2022 The company will provide escalation support and physical access on a per request basis.
u2022 99.9% ESXi host uptime is required in this environment, but no SLA has been specified for the hosted applications.
Drag each statement to its appropriate concept.
Answer:
New Questions 10
A customer is deploying a mission-critical Oracle database with high SLA requirements, including high performance and high availability. The customer has chosen to purchase an All-Flash vSAN solution.
Which three storage policies should be used? (Choose three.)
A. RAID5/6 for data disk and RAID1 for OS disk with FTT=2.
B. IOPS limit and checksum should be enabled.
C. RAID5/6 for OS disk and RAID1 for data disk with FTT=2.
D. Configure multiple disk stripes.
E. Deduplication and Compression should be disabled.
Answer: BCD
New Questions 11
Drag each option to its appropriate concept.
Answer:
New Questions 12
A company is implementing a new ESXi host cluster at its New York data center.
u2022 The CIO has stated that the new ESXi cluster should be deigned with enough failover capacity to sustain two ESXi host failures.
u2022 Six ESXi hosts have been approved for this workload.
u2022 The ESXi hosts are to be purchased from Dell with these specifications:
u2022 2x10 core 2.2GHz Intel CPU
u2022 128 GB of memory
u2022 The workload is defined as 150 employee desktop virtual machines each with 3GB RAM reserved.
u2022 All virtual machines should be protected by vSphere High Availability Which are two true statements regarding failover capacity? (Choose two.)
A. vSphete HA can be configured to reserve 25% of memory capacity for failover.
B. vSphete HA can be configured to specify two dedicated failover hosts.
C. vSphere HA can be configured to reserve 35% of memory capacity for failover.
D. vSphere HA can be configured to specify one dedicated failover host.
Answer: CD
100% Up to date VMware 3V0-624 Questions & Answers shared by Allfreedumps, Get HERE: https://www.allfreedumps.com/3V0-624-dumps.html (New Q&As)