Act now and download your Cisco 650-127 test today! Do not waste time for the worthless Cisco 650-127 tutorials. Download Replace Cisco CGE Authorized Connected Grid Engineer Knowledge Verification exam with real questions and answers and begin to learn Cisco 650-127 with a classic professional.

P.S. Certified 650-127 keys are available on Google Drive, GET MORE: https://drive.google.com/open?id=1Z4H8ZazLQ9zNKBPiqYNpywS1N8vZ93JM


New Cisco 650-127 Exam Dumps Collection (Question 1 - Question 10)

Q1. Which solution will allow remote engineering support for trouble or fault analysis?

A. remote engineering access (VPN)

B. network security

C. physical access control

D. network security

Answer: A


Q2. Hat is the most common deployment network requirement for precise timing distribution?

A. broadband and fiber

B. integration with LDAP

C. segmentation (isolation of critical data)

D. GPS clock at substation with IRIG-B

Answer: D


Q3. Refer to the exhibit. Which of these best describes the question mark?

A. local area network

B. multiservice Ethernet ring

C. Token Ring network

D. IEC 61850 station bus

Answer: D


Q4. What is Cisco's overall vision with respect to communications protocols?

A. To design and architect end-to-end communications infrastructure using confusing communication protocols.

B. To design and architect end-to-end communications infrastructure using foreign communication protocols.

C. To design and architect end-to-end communications infrastructure using open standard communication protocols.

D. To design and architect end-to-end communications infrastructure using proprietary communication protocols.

Answer: C


Q5. Which of these options includes the two major areas of the network within a substation in the Substation Automation architecture?

A. the electrical network and the data network

B. the primary WAN and the secondary WAN

C. the secure access side and the open access side

D. the station bus and the multi service Ethernet ring

Answer: D


Q6. What is the correct time delay for a critical GOOSE Type-1 message?

A. There is no specific time delay requirement.

B. Fewer than 10 ms

C. Less than 4 to 7 s

D. Less than 3 to 10ms

Answer: D


Q7. Which of the following models supports Power over Ethernet?

A. CGS-2520-24TC

B. CGS-2520-16S-8PC

C. All CGS models

D. None of the model supports POE

Answer: B


Q8. Which section of NERC-CIP specifies physical security requirements?

A. section 3

B. section 7

C. section 6

D. section 4

E. section 5

Answer: C


Q9. Which of these is a grouping of elements that are part of the Cisco Substation Automation solution?

A. data center and customer call centers

B. customer call centers, electrical auto recharging, home energy management

C. protection and control, grid monitoring, multi service communications networks

A. D. multi service communications networks

E. protection and control, auto meter reading, data analysis

Answer: C


Q10. Which product(s) are included in the first Cisco Smart Grid product offerings?

A. all existing Cisco products

B. Cisco Smart Grid 3000 ruggedized switching platform

C. Cisco Connected Grid Router 2010 and Connected Grid Switch 2520

D. ISR 2900 series and Catalyst 2960

Answer: C


P.S. Easily pass 650-127 Exam with Certleader Certified Dumps & pdf vce, Try Free: https://www.certleader.com/650-127-dumps.html (56 New Questions)