Q9. - (Topic 3) 

Your development team uses Scrum as its process framework. 

You are attempting to increase efficiency, code quality, and limit scope creep by making some changes to your team's development process. 

You need to identify key metrics for measuring the effect of any changes to your process. 

Which three key metrics should you use? Each correct answer presents part of the solution. 

A. number of story points delivered during the sprint 

B. number of manual test cases created 

C. number of bugs reported by testers 

D. number of tasks added to the sprint after the sprint starts 

E. number of classes in the code-base 

F. number of items added to the product backlog 

Answer: A,C,D 


Q10. DRAG DROP - (Topic 1) 

Your network environment includes a Microsoft Visual Studio Team Foundation Server (TFS) 2012 server. 

You need to configure TFS to send an email notification to a group of testers when a build is completed. 

What should you do? (To answer, move the three appropriate actions from the list of actions to the answer area and arrange them in the correct order.) 

Answer: 

30. - (Topic 1) 

You have a newly installed Microsoft Visual Studio Team Foundation Server (TFS). Both TFS and SQL server are installed on the same server. The SQL server installation includes the database engine component only. 

You need to utilize all available TFS Reporting features. 

Which two actions should you perform? Each correct answer presents part of the solution. 

A. Install SQL Analysis Services. 

B. Enable Data Quality Services. 

C. Install SQL Server Reporting Services. 

D. Install SQL Server Client Tools Connectivity. 

Answer: A,C 

Explanation: http://msdn.microsoft.com/en-us/library/dd578652.aspx 


Q11. - (Topic 1) 

Your network environment is configured according to the following table: 

The data tier has been configured to run Microsoft SQL Server Reporting Services (SSRS) 

in SharePoint Integrated Mode. 

You need to configure the TFS environment to support the addition of SSRS Reports. 

Which two actions should you perform? (Each correct answer presents part of the solution. Choose two.) 

A. Open the report in SQL Server Business Intelligence Development Studio and change the TargetServeruRL property of the report. 

B. Log on to the data-tier server and reconfigure SSRS to Native Mode. 

C. Log on to the data-tier server and rebuild the TFS data warehouse by using the TFSConfig.exe Rebuild Warehouse /all I ReportingDataSourcePassword : <password> command. 

D. Log on to the application-tier server and rebuild the TFS data warehouse by using the TFSConfig.exe RebuildWarehouse / all /ReportingDataSourcePassword: <password> command. 

E. Log on to the application-tier server and reconfigure TFS and SQL Reporting Services integration. 

Answer: B,E 


Q12. DRAG DROP - (Topic 2) 

You are using Microsoft Test Manager to view user stories and tasks in a new team project. You are building a new query that must return both work item types in a single result set. The default clause Team Project = @Project is already specified. You need to complete the 

query. 

What should you do? (To answer, move the three appropriate actions from the list of 

actions to the answer area and arrange them in the correct order.) 

Answer: 

102. - (Topic 2) 

You are using Microsoft Visual Studio 2012 to manage test environments for your company. 

You need to set up a two-computer environment for running tests. The environment needs to include: 

. A client computer running Windows 7 and . A server computer running Windows Server 2008 R2 SP 1, which acts as the web server and the database server. 

The server computer has already been created using Microsoft System Center Virtual Machine Manager (SCVMM). 

You need to create a lab environment for testing this configuration. 

What should you do? 

A. Install a physical machine with the client configuration. Connect both the client and the existing SCVMM server computers with Visual Studio 2012 through the Server Explorer window. 

B. Install and configure a virtual machine with the client configuration by using Hyper-V. Connect both the client and the existing SCVMM server computers with Visual Studio 2012 through the Team Explorer window. 

C. Install a physical machine with the client configuration. Create a new SCVMM lab environment by combining both the client and the existing SCVMM server computers by using Lab Center in Microsoft Test Manager (MTM) 2012. 

D. Install a physical machine with the client configuration. Create a new standard environment, combining the client and the server machines by using Lab Center in Microsoft Test Manager (MTM) 2012. 

Answer:


Q13. - (Topic 1) 

Your network environment includes a multi-tier Microsoft Visual Studio Team Foundation Server (TFS) 2012 server implementation. Developers use Visual Studio 2012. 

Your team has just started developing a very large enterprise-scale application. 

You need to create a workspace for the new project that meets the following requirements: 

. Developers should be able to use Visual Studio 2012 and earlier versions to work with the workspace. . Performance of the workspace should not be degraded when the number of items in the workspace increases. . The storage utilization of the developer local hard drive should be as minimal as possible. 

What should you do? 

A. Create a hybrid workspace. 

B. Create a server workspace. 

C. Create a server workspace and a Local workspace. Configure synchronization between both, and allow developers to utilize the local workspace. 

D. Create a local workspace. 

Answer:


Q14. - (Topic 2) 

You are using Microsoft Test Manager (MTM). You are using the Microsoft Visual Studio Scrum 1.0 process template. 

You are developing a test from an engineering document that has detailed verification information. 

You need to ensure that the document is directly accessible whenever a tester runs a specific step. 

What are two possible ways to accomplish this goal? (Each correct answer presents a complete solution. Choose two.) 

A. Add a test step attachment. 

B. Add a test case attachment. 

C. Add a tested backlog items link. 

D. Add a test case link. 

Answer: A,B 


Q15. - (Topic 2) 

You are using Microsoft Test Manager (MTM). Your development team is using Team Foundation Server (TFS) 2012 to associate requirements with source code and to automate builds. 

Your team has been testing against an old build. You want to assign a more recent automated build to the test plan. 

You need to review the requirements that have been affected between the current build and the new build before assigning it to your test plan. 

What should you do? 

A. In the Properties View of the Plan activity, click Modify the Build In Use. Select the appropriate build in the Available builds. Review the Associated work items between selected builds list. 

B. Set up a check-in policy that will force an association of a work item to the changeset. 

C. In the Assign Build view of the Track tab, click Modify. In Filter for builds, select the appropriate build to preview the list of work items. 

D. In the Queries view of the Track activity, create a custom query that lists all requirements that have the Fixed in Build field set to the new build. Run the build and review the results. 

Answer:


Q16. DRAG DROP - (Topic 1) 

Your company is installing Microsoft Visual Studio Team Foundation Server (TFS) 2013 in a new environment. 

Your IT department has 110 developers, 25 business analysts, 50 testers, and 30 Scrum Masters who will access this new instance of TFS in various capacities. 

You need to configure the servers to meet the minimum TFS 2013 system requirements. 

What should you do? To answer, drag the appropriate minimum requirement to the correct component Each minimum requirement may be used once, more than once, or not at all. You may need to drag the split bar between panes or scroll to view content 

Answer: