Your success in EMC E20-393 is our sole target and we develop all our E20-393 braindumps in a way that facilitates the attainment of this target. Not only is our E20-393 study material the best you can find, it is also the most detailed and the most updated. E20-393 Practice Exams for EMC E20-393 are written to the highest standards of technical accuracy.
Check E20-393 free dumps before getting the full version:
NEW QUESTION 1
Based on Dell EMC based practices, under what conditions would you consider creating multiple pools on a Unity 500?
- A. Separate resources for multi-tenancyCreate larger failure domains
- B. Combine pools where FAST Cache is and is not activeConsolidate resources for multi-tenancy
- C. Dedicate resources to meet specific performance goalsSeparate resources for multi-tenancy
- D. Combine pools where FAST Cache is and is not activeDedicate resources to meet specific performance goals
Answer: C
Explanation:
References: https://www.emc.com/collateral/TechnicalDocument/docu69895.pdf (p.13)
NEW QUESTION 2
Which quota policy calculates disk usage in 8 KB units?
- A. File Size
- B. Block
- C. User
- D. Directory Tree
Answer: B
NEW QUESTION 3
Which system level alert indicates an error has occurred that has no impact on the system and should be remedied in the near future?
- A. Error
- B. Warning
- C. Informational
- D. Notice
Answer: A
Explanation:
References: https://www.emc.com/collateral/white-papers/h15085-dell-emc-unity-unisphere-overview.pdf (23)
NEW QUESTION 4
What is the correct sequence of steps to provision storage for SMB NAS clients?
Solution:
Does this meet the goal?
- A. Yes
- B. Not Mastered
Answer: A
NEW QUESTION 5
Dell EMC Unity systems collect several metrics at various time intervals and use ESRS to send the information to CloudIQ.
What are those metrics and their time intervals?
- A. Alerts = 5 minPerformance = 5 minCapacity = 1 hrConfiguration = 1 hr
- B. Alerts = 2 minPerformance = 1 hrCapacity = 1 hourConfiguration = 1 hr
- C. Alerts = 5 minPerformance = 1 hrCapacity = 2 hourConfiguration = 1 hr
- D. Alerts = 2 minPerformance = 30 minCapacity = 1 hrConfiguration = 1 hr
Answer: A
NEW QUESTION 6
When a storage resource has a snapshot taken of it, where are writes to the storage resource written?
- A. New space allocated from the storage resource parent pool
- B. New space allocated in 256 MB stripes from FAST Cache
- C. Existing space of the storage resource
- D. Existing space from the Reserves LUN Pool
Answer: A
NEW QUESTION 7
What is the minimum memory requirement for a host running VMware ESXi 6.0 to support the deployment of a UnityVSA system?
- A. 8 GB
- B. 12 GB
- C. 16 GB
- D. 18 GB
Answer: B
Explanation:
A minimum of 12 GB RAM per UnityVSA VM is recommended.
References: https://www.emc.com/collateral/TechnicalDocument/docu69316.pdf (page 2)
NEW QUESTION 8
What is the maximum recovery point objectives (RPOs) configurable when using Unity native asynchronous replication?
- A. Minimum = 1 minuteMaximum = 60 minutes
- B. Minimum = 1 minuteMaximum = 1440 minutes
- C. Minimum = 5 minutesMaximum = 60 minutes
- D. Minimum = 5 minutesMaximum = 1440 minutes
Answer: D
Explanation:
References:
https://www.dellemc.com/en-ie/documentation/unity-family/unity-p-replication-config/02-unity-rep-br-workflo
NEW QUESTION 9
What is the maximum number of file system snapshots that are supported by Unity?
- A. 16
- B. 96
- C. 256
- D. 512
Answer: C
NEW QUESTION 10
Which FAST Cache operation proactively copies dirty pages to underlying hard disk drives?
- A. FAST Cache flushing
- B. FAST Cache promotion
- C. FAST Cache warming
- D. FAST Cache cleaning
Answer: A
NEW QUESTION 11
Which VASA API protocol is used to integrate with Dell EMC UnityVSA over HTTPS?
- A. SNMP
- B. WSDL
- C. SOAP
- D. REST
Answer: D
NEW QUESTION 12
Which FAST VP operation can be performed from the System Settings window?
- A. Modify data relocation schedule
- B. Delete snapshots from the tier
- C. Cancel data relocation operations
- D. Manually start data relocation
Answer: A
NEW QUESTION 13
A Unity storage system is installed with 10 Gb optical SFPs in CNA ports 4 and 5 of both Storage Processors. The storage administrator has had a request from a user to connect to the storage system through Fibre Channel.
How can the administrator reconfigure the CNA ports for 16Gb Fibre Channel SFPs?
- A. Configure all CNA ports for 16Gb Fibre Channel
- B. Configure CNA port 4 of SPA and SPB as 10Gb opticalConfigure CNA port 5 of SPA and SPB as 16 Gb Fibre Channel
- C. Configure CNA port 4 and 5 of SPA as 10 Gb opticalConfigure CNA ports 4 and 5 of SPB as 16 Gb Fibre Channel
- D. CNA ports cannot be reconfigured once they are committed
Answer: D
Explanation:
Once you set the network protocol on the CNA ports you cannot switch to a different network protocol.
References: https://www.emc.com/collateral/TechnicalDocument/docu60144.pdf (page 5)
NEW QUESTION 14
A storage administrator wants to add as asynchronous replication session to a pair of Unity systems with an existing synchronous replication session that is operating correctly. Which configuration steps are needed?
- A. Create Replication interfaces on both systems.Modify the Replication Connection Mode.Run a Replication Connection Verify and Update operation.
- B. Create Replication Interfaces on the source system.Modify the Mode for Replication Connection.Perform a manual Sync operation on the Asynchronous session.
- C. Create Replication Interfaces on destination system.Establish FC connectivity using the Synchronous FC Ports of each system.Perform a manual Sync operation on the Asynchronous session.
- D. Create Replication Interfaces on both systems.Establish FC connectivity using the Synchronous FC Ports of each system.Run a Verify and Update operation for the Replication Connection
Answer: A
Explanation:
To fully configure asynchronous replication between systems, you must do each of following: Note: To fully configure synchronous replication, you must complete each of following:
NEW QUESTION 15
Which feature provides the ability to provision block and file storage for Microsoft Windows or Microsoft SharePoint sites?
- A. EMS Storage Integrator for Windows
- B. Array Offloaded Data Transfer
- C. vStorage APIs for Array Integration
- D. EMC Virtual Storage Integrator
Answer: A
NEW QUESTION 16
What is the correct sequence of steps required to deploy a Dell EMC UnityVSA?
Solution:
Does this meet the goal?
- A. Yes
- B. Not Mastered
Answer: A
NEW QUESTION 17
Which storage objects support Advanced Deduplication?
- A. VMFS datastores and VVols
- B. Thin LUNs and thick LUNs
- C. Thick LUNs and VVols
- D. Thin LUNs and thin VMFS datastores
Answer: D
NEW QUESTION 18
How long before a license expires will UnityVSA send the first alert warning?
- A. 3 days
- B. 7 days
- C. 15 days
- D. 1 month
Answer: D
Explanation:
As a reminder, UnityVSA displays several alerts in Unisphere prior to the license expiration date. The table below shows when alerts are generated leading up to the expiration date.
NEW QUESTION 19
......
P.S. Easily pass E20-393 Exam with 297 Q&As Dumps-files.com Dumps & pdf Version, Welcome to Download the Newest Dumps-files.com E20-393 Dumps: https://www.dumps-files.com/files/E20-393/ (297 New Questions)