It is more faster and easier to pass the Tibco Software Inc TB0-121 exam by using Validated Tibco Software Inc TIBCO ActiveMatrix® BPM Solution Designer Exam questuins and answers. Immediate access to the Renew TB0-121 Exam and find the same core area TB0-121 questions with professionally verified answers, then PASS your exam with a high score now.

2021 Oct TB0-121 exam answers

Q1. DRAG DROP

Select the correct steps to create an LDAP Shared Resource and place them in the correct order.

Answer: 


Q2. In which three ways can participants be defined in a User task? (Choose three.)

A. Dynamically

B. Round-robin

C. Randomly

D. Statically

E. Using expressions

Answer: ADE


Q3. You are modeling the business processes for a technical call center. In the Organization Model, which action should you take to ensure that a service request always goes to a call center executive who has the necessary language skills and a specific technical certification?

A. Assign Privileges to a Capability to route the call

B. Assign Qualifiers to a Category to route the call

C. Assign Qualifiers to a Capability to route the call

D. Assign Properties to a Capability to route the call

Answer: C


Q4. CORRECT TEXT

Click the Exhibit button.

The process shown in the exhibit contains User tasks A, B, C, D, E, F. These task can all be enabled at the same time. Another User task. Client Cancels, is enabled all of the time to handle any unexpected contact from the customer.

It is required that when Client Cancels is completed, User tasks A, B, D, E must be withdrawn if they are still enabled. However, tasks C and F must be left unchanged. A Throw Signal Event is placed after Client Contacts completes.

Which two patterns might be used to satisfy this use case? (Choose two.)

A. Place a matching Catch Signal Event on the boundary of each of User tasks A, B, D, E

B. Place User tasks A, B.D.E in an embedded sub-process, and put a Catch Signal Event on its boundary

C. Place an End Event of type Terminate Process after the Client Cancels User task

D. Place a Catch Error Event on the boundary of each of User tasks A, B, D, E

Answer: AB


Q5. Click the Exhibit button.

Which service types could be selected to fix the Service task configuration error shown in the exhibit?

A. E-Mail, Database, RESTful

B. Database, RESTful, Web Service

C. Java, JMS, Web Service

D. Java, Database. E-Mail

Answer: D


Replace TB0-121 free exam questions:

Q6. Which two functions are available to the user when using a Supervisor Work View? (Choose two.)

A. Allocate selected work items to self

B. pend selected work items

C. Cancel selected work items

D. Allocate selected work items to offer set

E. Open selected work items

Answer: CD


Q7. A process with multiple parallel branches from a single path must converge into a single path. When the activities in one branch are completed and reach the point of convergence, control must be passed to the single path without waiting for the other branches to complete.

Which Workflow Control Pattern should be used to achieve this functionality?

A. Structured Discriminator

B. Cancelling Discriminator

C. Structured Synchronizing Merge

D. Multi-Merge

Answer: A


Q8. A process requires that multiple paths of an activity are performed simultaneously. A subsequent activity can only be performed when every path has completed.

Which Process Control Pattern satisfies the requirement?

A. Synchronization

B. Simple Merge

C. Cancelling Discriminator

D. Multi-choice

Answer: A


Q9. Which two statements are true about Pageflow processes? (Choose two.)

A. Pageflow User tasks can be separated by Service tasks.

B. Service tasks are not allowed in Pageflow processes.

C. All User tasks in one Pageflow instance are processed by a single user.

D. User tasks in one Pageflow instance can be offered to different users.

Answer: AC


Q10. Which two statements are true about TIBCO Business Studio Asset Central? (Choose two.)

A. It only allows for multiple versions of projects to be retained in the local workspace.

B. It allows for multiple versions of projects to be shared between multiple users via a source control server

C. It requires that process designers are permanently connected to the source control server.

D. It allows for a project to be checked out of the source control server and modified offline.

Answer: BD