Master the 2V0-651 VMware Certified Professional 6 - Desktop and Mobility Beta content and be ready for exam day success quickly with this Testking 2V0-651 exam question. We guarantee it!We make it a reality and give you real 2V0-651 questions in our VMware 2V0-651 braindumps.Latest 100% VALID VMware 2V0-651 Exam Questions Dumps at below page. You can use our VMware 2V0-651 braindumps and pass your exam.

Q51. An administrator is configuring the View Connection Broker Agent. The Adapter instance is properly configured within vCenter Operations Manager for Horizon. When the administrator clicks on the Test button to pair the server, the test fails. IP address and name resolution are validated and working for both servers.

What should the administrator do to verify connectivity between both servers?

A. Verify that a proper Fully Qualified Domain Name exists for the vCenter Operations for Horizon servers.

B. Verify that the certificate on the vCenter Operations for Horizon server is recognized by the View server.

C. Login with a domain admin account, instead of a local account on the View server.

D. Verify that the proper port is open between vCenter Operations for Horizon and the View server.

Answer: D


Q52. An organization has a View deployment with a Dedicated Full Clone Pool of Windows 7 desktops. Users connect to the desktops using a Zero Client with firmware 4.1.2. Periodically, the desktops display a black screen after inactivity or after they go to sleep mode. The View Connection Manager indicates the desktops are Connected.

An administrator finds the following PCoIP log messages:

<Date, Time> LVL:0 RC:0 SERVER==> WindowProC.Detected WM_DISPLAYCHANGE event (1900x1200)

and

<Date,Time>LVL:2 RC.0 IMG_FRONTEND:DisplayDevice[0] states - DISPLAY_DEVICE_ATTACHED_TO_DESKTOP DISPLAY_DEVICE_ACTIVE

What should the administrator do to resolve the issue?

A. Configure the virtual desktop power management option Turn Off Display to Never.

B. Configure the virtual desktop power management option Sleep to Never.

C. Configure the virtual desktop power management option Turn Off Hard Disk to Never.

D. Configure the virtual desktop power management option PCI Express Link State Power Management to Off.

Answer: A


Q53. An administrator is performing the post-installation configuration of Workspace Portal.

While running the setup wizard, the administrator receives an error message. The error message appears during configuration of the Directory settings and indicates that the user account cannot be found.

The administrator has confirmed the following:

✑ The user account exists in Active Directory.

✑ The user account has all of the required attributes.

What is causing the error?

A. The user account is located below the Base DN.

B. The user account has not been entered into the Global Catalog.

C. The user account is located above the Base DN.

D. The user account name is too long.

Answer: C


Q54. Refer to the Exhibit.

Based on the exhibit, which pathway is used for RDP traffic?

A. Path A

B. Path B

C. Path C

D. Path D

Answer: B


Q55. An administrator has installed View and needs to configure the PCoIP settings via a Group Policy Object (GPO).

What should the administrator do first?

A. Create a GPO and apply the required policy settings.

B. Add pcoip.adm to the Administrative Templates on a View Connection server.

C. Link the GPO to the Organizational Unit (OU) that contains the virtual desktops.

D. Add pcoip.adm to the Administrative Templates on an Active Directory server.

Answer: D


Q56. An administrator needs to increase the number of desktop resources in a dedicated assignment manual pool. This pool is made of unmanaged virtual machines.

What should the administrator do?

A. Create additional virtual machines and add them to the pool as desktop sources.

B. Edit the pool settings to increase the minimum number of desktops.

C. Change the vCenter Server settings in the pool to Provision on demand.

D. Increase the number of available replica virtual machines in View Composer.

Answer: A


Q57. While deploying a View desktop pool, an administrator determines that the virtual desktops remain at a status of Customizing.

In the debug-timestamp.txt log file of the View Agent, the administrator finds the error message:

Debug - Unable to connect to JMS Server.com.vmware.vdi.agent.messageserver.Jmsmanager.a(SourceFile:238) javax.jms.JMSException:Unable to create a connection to:[ServerEntry, hostname, port=4001]

What should the administrator do to troubleshoot the connection problem?

A. Verify that the View Composer Guest Agent Server service is set Started on the virtual desktops.

B. Verify that the View Agent can communicate with the View Connection Server over port 4001.

C. Verify that the View Connection Server can resolve the DNS name of the vCenter Server.

D. Verify that the View Security Server can establish a connection using the AJP13 protocol over port 4001.

Answer: B


Q58. Which virtual disk type should an administrator use to reclaim unused space in a Linked Clone?

A. Thin Provisioned Disk

B. SE Sparse Disk

C. Monolithic Sparse Disk

D. Flat Disk

Answer: B


Q59. A recompose operation on a linked-clone pool has failed. An error on the pool indicates the Computer Account in Active Directory is missing, but a search for the account in Active Directory verifies that it is present.

What condition would cause this error in View?

A. The Computer Account has been moved out of the Organizational Unit in which it was created.

B. The Quickprep domain user account has been moved to a different Organizational Unit.

C. A new GPO has been applied to the Computer Account.

D. The Quickprep domain user account does not have the Administrator role in View Administrator.

Answer: A


Q60. What should the administrator do first when configuring vCenter Operations Manager for Horizon to monitor their View deployment?

A. Add Adapter from the View Configuration > Servers page in View.

B. Add Adapter from the Custom Dashboard page > Configuration in vCenter Operations Manager.

C. Configure the Adapter from the Administration > Solutions page in vCenter Operations Manager.

D. Configure the Adapter from the View Configuration > Global Settings page in View.

Answer: C