It is more faster and easier to pass the IBM C2010-555 exam by using Certified IBM IBM Maximo Asset Management v7.6 Functional Analyst questuins and answers. Immediate access to the Improve C2010-555 Exam and find the same core area C2010-555 questions with professionally verified answers, then PASS your exam with a high score now.

Free demo questions for IBM C2010-555 Exam Dumps Below:

NEW QUESTION 1
An administrator needs to enable a prompt in the Organizations application for users to enter the Failure Class when completing or closing work orders.
Which option is used to enable this?

  • A. PM
  • B. Asset
  • C. Work Type
  • D. Safety Plan

Answer: C

NEW QUESTION 2
A company has a number of complex leased assets and wishes to stop child assets that are part of the subassembly from being moved. How can this be accomplished?

  • A. Check the Maintain Hierarchy checkbox on the asset record
  • B. Check the Lock Asset checkbox on the Lease Rental Contract
  • C. Check the Maintain Hierarchy checkbox on the rotating item record
  • D. Check the Maintain Hierarchy checkbox on both the asset and the item record

Answer: A

NEW QUESTION 3
An engineer schedules a very complex asset report developed in BIRT. The engineer needs to set a feature to be able to retrieve the report contents from within Maximo for very large files that are restricted by the email server.
Which feature does this?

  • A. Direct Print
  • B. Email with a File URL
  • C. Email with a File Attachment
  • D. REPORTSCHEDULE cron task

Answer: D

NEW QUESTION 4
A company wants to trigger a PM based on a characteristic type meter. How can this be accomplished?

  • A. Create a master PM and link to the characteristic on the Related Records tab.
  • B. Create a condition monitoring point and specify the PM on the upper or lower limit.
  • C. Create a PM against the asset and specify the meter on the Frequency tab of the PM.
  • D. Create an escalation based on the characteristic meter and trigger the PM via an action.

Answer: B

NEW QUESTION 5
The buyer for a vendor received an offer to acquire a specific item and if a certain quantity is ordered, a specific cost for that item will be given. Which purchase contract type needs to be created?

  • A. Price
  • B. Master
  • C. Blanket
  • D. Purchase

Answer: D

NEW QUESTION 6
An administrator needs to report failures that are occuring on a monthly basis. There is a requirement to use the Failure Class to report these failures.
Which applications can accomplish this?

  • A. Hazards, Precautions, Job Plans
  • B. Assets, Locations, Work Order Tracking
  • C. Job Plans, Routes, Work Order Tracking
  • D. Preventive Maintenance, Condition Monitoring, Safety Plans

Answer: B

NEW QUESTION 7
A company purchased many non-rotating as well as rotating assets and needs to understand the differences between them.
Which of the following are true? (Choose two.)

  • A. Rotating assets allow for maintaining an inventory of serialized components.
  • B. Both asset types allow for maintaining an inventory of serialized components.
  • C. Non-rotating assets allow for maintaining an inventory of serialized components.
  • D. Rotating assets can be held in inventory prior to moving to an operating location.
  • E. Non-rotating assets can be held in inventory prior to moving to an operating location.

Answer: AE

NEW QUESTION 8
A company has business units that each have different GL account structures from each other. What needs to be created?

  • A. One organization for each business unit.
  • B. One organization with a site for each business unit.
  • C. One organization with a currency code for each business unit.
  • D. One organization with different GL account structure definitions for each business unit.

Answer: B

NEW QUESTION 9
An administrator want to create a time based escalation point to evaluate to 30 days in the future.
What is the correct value to use in the Elapsed Time Interval field along with the Elapsed Time Attribute?

  • A. Today + 30
  • B. Sysdate + 30
  • C. +30 (positive 30)
  • D. -30 (negative 30)

Answer: C

NEW QUESTION 10
A user has created a request for quotation and sent it to vendors. After receiving the responses from the vendors, the user will need to create a purchase order.
What action must be performed before a purchase order can be created?

  • A. Purchase requisitions must first be created.
  • B. Status of the request for quotation must be APPR.
  • C. Request for quotation lines must be awarded to a vendor.
  • D. Vendor quotation receipt transactions must be completed.

Answer: B

NEW QUESTION 11
Which technique or setting will an administrator use to prevent a PM from being modified by its Master PM?

  • A. The Override Updates flag on the PM
  • B. The PM options dialog of Organizations
  • C. A data restriction on the Master PM object
  • D. The Lock Forecast Dates action on the PM

Answer: A

NEW QUESTION 12
An administrator wants to create multiple individual KPI records from a single KPI template. What action must be taken?

  • A. Save Record
  • B. Generate KPI
  • C. Schedule KPI
  • D. Run KPICRON tasks

Answer: B

NEW QUESTION 13
A company has a work order with 50 separate tasks and 40 of the tasks have been completed. The company would like the remaining 10 tasks grouped with a new parent work order.
Which option will group the tasks?

  • A. Select the task work orders and Create Work Package.
  • B. Select the task work orders Create Job Plan from Work Plan.
  • C. Create a new work order and add the task work orders on the Plans tab.
  • D. Create a new work order and add the child work orders on the Plans tab.

Answer: A

NEW QUESTION 14
A company needs to add the unit of measures for items, tool and services. In which application can this be done?

  • A. Receiving
  • B. Storerooms
  • C. Asset Templates
  • D. Request for Quotations

Answer: A

NEW QUESTION 15
A fixed-schedule PM needs to be set up.
What other setting need to be selected in addition to the frequency value?

  • A. Alert Lead (DAYS) must equal 0
  • B. Alert Lead (DAYS) must be greater than 0
  • C. Use Last Work Order's Start Date to Calculate Next Due Date? checked
  • D. Use Last Work Order's Start Date to Calculate Next Due Date? unchecked

Answer: C