It is more faster and easier to pass the EMC DES-6322 exam by using Actual EMC Specialist - Implementation Engineer-VxRail Exam questuins and answers. Immediate access to the Up to date DES-6322 Exam and find the same core area DES-6322 questions with professionally verified answers, then PASS your exam with a high score now.

Check DES-6322 free dumps before getting the full version:

NEW QUESTION 1
Which requirement must be met when expanding a 3-node VxRail G560F cluster with a fourth G Series node in the same chassis?

  • A. PCIe network card must be added to all nodes
  • B. Node requires only the same drive configuration
  • C. Node hardware must be identical to the other three nodes
  • D. New node must be at the same VxRail version as existing nodes

Answer: B

NEW QUESTION 2
Which command can be used from the VxRail Manager VM to restart the loudmouth daemon?

  • A. systemctl restart loudmouth
  • B. /usr/lib/vmware/loudmouth/bin/loudmouthd restart
  • C. /etc/init.d/loudmouth restart
  • D. systemctl restart vmware-loudmouth

Answer: D

NEW QUESTION 3
A VxRail D560 cluster was delivered six months ago and now needs to be prepared for installation with the target code. What is the correct method to complete the task?

  • A. Boot into RASR ISO and perform a RASR Reset
  • B. Boot into RASR USB and perform a RASR Reset
  • C. Boot into SD card and perform a Factory Reset
  • D. Boot into RASR ISO and perform a Factory Reset

Answer: A

NEW QUESTION 4
What code is returned when a VxRail API request is executed successfully?

  • A. 200
  • B. 207
  • C. 400
  • D. 500

Answer: A

NEW QUESTION 5
An implementation engineer is expanding an existing VxRail S Series cluster with an additional node. The version of the node is not at the current cluster level but is compatible.
What procedure would result in the quickest node addition?

  • A. RASR Factory Image Upgrade
  • B. Factory Reset
  • C. VxRail Node Imaging Management
  • D. Compute node expansion

Answer: D

NEW QUESTION 6
What is a supported witness configuration for a 3+3+1 VxRail Stretched Cluster?

  • A. vSAN Witness appliance with customer provided license
  • B. Physical ESXi host with included cluster license
  • C. Physical ESXi host with multiple VxRail clusters as witness
  • D. vSAN Witness appliance or a physical ESXi host

Answer: D

NEW QUESTION 7
Which two files are used to automate VxRail deployment and validate the network configuration?

  • A. Appliance JSON file PEQ data file
  • B. VxRail Configuration Portal PEQ data file
  • C. VxRail Test Plan SPEQ
  • D. Appliance JSON file SPEQ

Answer: A

NEW QUESTION 8
From what environment must a network administrator run VxRail network validation?

  • A. Windows PowerShell command prompt
  • B. Same subnet as VxRail Management Network
  • C. Top of Rack switches
  • D. VxRail Deployment Wizard

Answer: C

NEW QUESTION 9
An implementation engineer is reviewing the customer requirements for a VxRail implementation The customer has specified noncontiguous hostnames and IP addresses
What option should the engineer select in the VxRail Deployment Wizard to input the hostnames and IP addresses?

  • A. Autofill - with the correct incrementor
  • B. Advanced
  • C. Autofill - with the correct offset
  • D. Custom

Answer: C

NEW QUESTION 10
Which vSAN feature requires an All-Flash cluster?

  • A. Deduplication and compression
  • B. Data-at-Rest Encryption
  • C. Data-in-Transit Encryption
  • D. Storage Policy Based Management

Answer: A

NEW QUESTION 11
An implementation engineer is deploying a new VxRail cluster What should they confirm before installing the hardware?

  • A. At least 24 in (61 cm) of clearance exists in front of and behind the cabinet
  • B. Redundant power zones exist with adequate power cables
  • C. Power distribution supports only the power rating of a single node
  • D. Service laptop is on the same IP network as the iDRACs

Answer: B

NEW QUESTION 12
An implementation engineer is working with a customer to prepare an external vCenter Server for a new VxRail deployment with the VxRail-deployed VDS. What vCenter objects must exist for a successful VxRail deployment?

  • A. Cluster and VxRail Management user only
  • B. Datacenter Cluster, and VxRail Management user
  • C. Datacenter and Cluster only
  • D. Datacenter and VxRail Management user only

Answer: D

NEW QUESTION 13
According to the VxRail PEQ Engagement Details worksheet, links to what resources should the SE send to the customer?

  • A. VxRail vCenter Server Planning Guide Network Validation Tool
  • B. VxRail vCenter Server Planning Guide VxRail Network Planning Guide
  • C. VxRail QuickStart Guide VxRail Network Planning Guide
  • D. VxRail QuickStart Guide Network Validation Tool

Answer: D

NEW QUESTION 14
A VxRail 7.0.100 environment is managed by the internal vCenter Server. The customer asks the implementation engineer to deploy a new VxRail cluster using the existing vCenter Server.
What should the response of the engineer?

  • A. Not supported for internal vCenter Server
  • B. Not supported on VxRail software 7.0.100
  • C. Supported by neither the internal vCenter Server nor external vCenter Server
  • D. Only supported on VxRail software 4.7.xxx

Answer: D

NEW QUESTION 15
An infrastructure system audit will begin in two weeks All data center devices will be checked to ensure they contain the installed patches and configurations. A system engineer will update the VxRail hosts with the latest patches and remediate security vulnerabilities.
What troubleshooting resource can a user receive from Dell and use proactively to help perform the remediation tasks?

  • A. KB articles
  • B. SolVe Online
  • C. Log files
  • D. Advisories

Answer: C

NEW QUESTION 16
......